24-25 May 2017 | Dusit Thani Hotel, Dubai, UAE.
Eng. Ali Al-Ebrahim
Senior Engineer Network Planning
GCC Interconnection Authority
Forum Day Two: Thursday, 25 May 2017
Thursday, May 25th, 2017
11:45 AM Case Study: Pumped storage: The Middle East’s potential for hydroelectric storage
- Understanding the use of pumped storage in power generation
- Analyzing the advantages of pumped storage in GCC
- Addressing feasibility of pump storage in GCC and analysing strategic locations for development